PROJECTS
Central to the firm success is the ability to keep pace with technical developments and the changing demands of the construction industry. By combining expertise in design with an understanding of the economic considerations involved with construction, the company is able to achieve substantial economies without compromising serviceability or structural potential.
Fire And Rescue – Pyrmont Fire Station
Redevelopment of the existing heritage listed Pyrmont Fire Station and included refurbishment of the fire station and seamlessly integrating new 3 storey extensions for office personnel
Barker College Grandstand Hornsby
A modern grandstand for Barker that seats over 500 people. It features smaller seating 'pods' and a central tiered area, covered by cantilevering sloping canopies, to blend well with the landscape while meeting the school's seating needs.
Fire and Rescue Headquarters Greenacre
Structural and civil design & documentation of a new state-of-the-art facility for Fire & Rescue NSW state operations.
Harrington Park Public School
19 new permanent learning spaces. These spaces are complemented by new staff and administration facilities, a new covered outdoor learning area (COLA) and a new hall and library.
Riverstone Police Station
Expansion of an existing 1892 heritage building with a new two-storey addition and updates to the existing station.
Tweed Heads Police Station
Police cars and storage facilities are housed on the ground floor of the building, while offices, including private offices and open-plan workspaces for employees, make up the majority of the first and second floors.
Waves Aquatic and Leisure Centre
This new state-of-the-art facility, which replaces the old aquatic center. The new facility will include indoor and outdoor pools, a splash pad, a gym, multipurpose rooms, and extensive landscaping and parking. It will be centered around the existing heritage building on the site.
Fresh Hope Care
Fresh Hope Care East Maitland is located on a 1.5 Hectare site in NSW. This residential aged care facility comprises 168 beds with non-institutional 'care household' environments.
Armidale Secondary College
This new facility amalgamated the two local high schools , the new facility will have the ability to cater for 1600 students and is centred around the existing heritage building.
Broken Hill Police Station
The design for Broken Hill Police Station merges all aspects of crime management and police administration into a single unified 24-hour facility.
The Beach Hotel
Situated in the coastal suburb of Merewether, Newcastle. The project was completed in 3 stages over 3 different levels of the structure.
Cessnock Police Station
This project is a two-story facility with conference, office, and maintenance areas. A partial demolition of a heritage building with façade alterations, a wash bay, a highway police parking space, and a vehicle holding bay are among the other exterior buildings.
Tempo Mixed Use Development
The project consists of 3 buildings situated on the main arterial road though Drummoyne and backing on to Formosa Street. A 6 storey mixed use commercial and residential development, it also contains 2 storeys of boundary to boundary basement carparking.